Public-private partnership in the recovery and geometric improvement of the municipal boundary lines.
Case of study of Alberic and Gavarda, Valencia (Spain)
Keywords:
to survey, making boundaries, municipal boundary, jurisdiction area, public-private par-entship (PPP), cadastral map, minute, notebookAbstract
The public-private partnership in the process of recovery and
geometric improvement of the municipal boundary lines has
the duality of motivating the economic activities of pro-fessionals,
as well as accelerate their process of technical regularization.
In the case of Alberic and Gavarda municipal boundary line,
in Valencia (Spain), a public-private partner-ship was carried out
based on the proposed solutions, continuing with the technical
work of reconnaissance of existing cairns, observation and
redesign of those missing, as well as the sign of the Additional
Minute to the Delimitation Minute, carried out in 1903, plenary
endorsement and subsequent registration in the Cartography
Central Register.
Downloads
Download data is not yet available.
Additional Files
Published
2020-09-01
How to Cite
Iborra-Fabra, R., Femenia-Ribera, C., & Mora-Navarro, G. (2020). Public-private partnership in the recovery and geometric improvement of the municipal boundary lines.: Case of study of Alberic and Gavarda, Valencia (Spain). REVISTA INTERNACIONAL MAPPING, 29(201), 16–21. Retrieved from https://ojs.revistamapping.com/MAPPING/article/view/325
Issue
Section
Artículos Científicos